Poured

IMG_20190614_151755

On Friday our special work team called to say the cement was being poured.  Since I was in Indianapolis, I was grateful Bill could be there to take photos and pay for the delivery.  We paid for eight yards of cement/concrete and we had ten minutes per yard to unload it.  Our crew got it done in 30 minutes.

IMG_20190614_152558

They prepped the pit area with a wire mesh to reinforce the concrete. Then, before the cement was poured, they put a leveling stake in the center. They made sure it was level with the form on the outside.

IMG_20190614_154336

IMG_20190614_154228

IMG_20190614_154744

Throughout the process they used that stake and a rod to keep the cement surface level.

IMG_20190614_155215

IMG_20190614_155654

IMG_20190614_155941

At the very end, they smoothed the surface over.

IMG_9445_20190615_205637

Saturday the wood frame was removed and the surface scored.

It’s all ready now for the next workday on June 29th.

 